Aya Gold & Silver: Record 2023 Production, Revenue and Operating Cash Flow

MONTREAL, March 28, 2024 (GLOBE NEWSWIRE) — Aya Gold & Silver Inc.December 31December 31December 31,December 31,2023 Annual Financial & Operational HighlightsFigure 1 – Ongoing Installation of the Ball MillThe Corporation expects 2024 production from Zgounder to range between 2.6 and 3.2 million silver oz at a cash cost of between $13.00 – $14.50/oz. The increase in cost is due to the lower grades at the mills in 2024, the additional development work needed in 2024, and the additional costs associated to the start-up of the expansion. It is also in conjunction with a higher silver price. The following metal prices and foreign currency assumptions were used in the guidance: USD/CAD 1.39; and USD/MAD 10.50.((((((
(GlobeNewsWire)